Historic Machinery Services provides complete one-stop boiler restoration and repair
services. We manufacture and machine boiler parts in house to insure quality code products. Although Historic Machinery is
not a holder of an R stamp, our boiler work is perfomed following the NBIC (National Board Inspection Code) for repairs and
the ASME (American Society of Mechanical Engineers) for welder qualification, new work and new designs. Complete turn-key boiler
survey's, including the on-site boiler component measuring and drawings, UT (Ultra Sonic Metal Thickness
measurements), and visual inspections are performed by Historic Machinery Services. Calculation and design
aspect usually done, or reviewed by an R and S stamp holder with which we have 30 years' association. This provides
an independent review of the boiler's condition by a third, neutral party. Whether repair is riveted or welded, or alterations
required, Historic Machinery has the experience, capacity and resources to perform not only tradional, but modern repair techniques.

Wilmington and Western 4-4-0 #98 at Green Bank Station
|

A view of the interior of a locomotive boiler (Wilmington
& Western #98). All firebox sheets except the crown sheet were replaced. New front tube sheet, new backhead and front tube
sheet braces were installed. Flush patches were applied to the first course and outside firebox. A new smoke box was assembled
and installed, as well as numeorous new boiler studs and threaded machined connections.
|
|

Outside
firebox sheets are removed and later were replaced. Historic Machinery Services will rivet the inside and outside sheets to
the mud ring.
|

With
welding completed, the weld joints radiographically examined, drilled and reamed rivet holes, we are ready to begin driving
rivets.
|
|

A full installation of new backhead braces, tensioned
and ready for application of the door sheet.
|

Old
loop style backhead braces were replaced with new ASME design braces.
|
|

New
smoke box shell and ring assembled by riveting team.
|

New unflanged front tube sheet fitted and prepared
for welding. Welded braces and dry pipe ring are laid out to reduce the original design's stress problems. With the numerous
defects and stress problems the welded alterations provided a cost effective repair and improvement.
|